Asta Powerproject viewer: open a .pp file online
Received a construction programme as an Asta Powerproject .pp file and have no Powerproject? This Asta Powerproject viewer opens it in your browser: see the tasks and the Gantt chart free, then keep the programme as Excel and PDF.
- See the Gantt chart free before you pay.
- Excel and PDF in one go.
- Refund in one click if it is not usable.
- Deleted after 24 hours. Nobody looks at it.
Project plans people open with us
- Construction schedules
- Software release plans
- Engineering projects
- Event plans
- Tender and bid schedules
- Office moves
- Old project archives
How to open Asta Powerproject files
-
STEP 1
Upload your .pp file
One plan or many. No Asta Powerproject needed.
-
STEP 2
See the Gantt chart first
Tasks, dates and bars, ready in seconds.
-
STEP 3
Pay once, download
Excel with every task and a PDF Gantt chart. Refund in one click.
What you get back
- Every task in ExcelID, WBS, indented names, durations, dates, % complete, predecessors, resources, notes.
- A Gantt chart PDFTask table and bars on landscape pages, the date scale on every page.
- Resources and detailsPeople, equipment and materials, plus the project title, manager and dates.
- Asta Powerproject and Easyproject.pp files saved by Powerproject or Easyproject, one project per file.
- See it firstEvery page in the preview before you pay, so there are no surprises.
Price
See the Gantt chart free. Then $4.99 per plan, or $14.99 for up to 10 files and $39 for up to 100. One payment, no subscription.
What is a .pp file?
PP is the file format of Asta Powerproject, the planning software by Elecosoft (formerly Asta Development) that is popular with construction contractors, especially in the UK. Asta Easyproject, its smaller sibling, writes the same .pp files. One .pp file holds one project, which can contain subprojects and subcharts: the tasks with their dates and durations, the links between them, calendars, resources and the bars of the bar chart. Main contractors send their programme to clients, quantity surveyors, subcontractors and suppliers as a .pp file next to a PDF printout, and the PDF is often out of date or missing the part you need.
Why a .pp file will not open on your computer
Only Powerproject knows the format. Powerproject is a paid Windows program, licensed per user, so the people who receive a programme often do not have it: a client, a consultant, a site manager on a Mac, a subcontractor working from a phone. Elecosoft offers a read-only Project Viewer for Powerproject files, which runs where Powerproject runs, on Windows, and needs to be installed. If you are on a Mac or a phone, cannot install software on a work computer, or simply need the tasks in Excel, a .pp file stays closed. Renaming it does not help: .pp is a binary format, not text, so Excel and Notepad show nothing useful.
Asta Powerproject viewer for Windows, Mac or a phone
Here it works the same on every computer, in the browser: drop the .pp file above and in a few seconds the tasks and the Gantt chart appear on the screen. There is nothing to install and no account to make. On an iPhone or Android phone, pick the file from Files or straight from the e-mail attachment. The preview is free and shows the first pages, so you can check that it is the right programme and that it opened well before you pay anything. If a file does not open, you see that at once and are not charged.
What you get from an Asta Powerproject file
An Excel workbook with one row per task: ID, WBS, the task name indented under its summary, duration, start and finish, % complete, predecessors with the link type and lag (for example 12FS+2d), resources and notes. A Resources sheet and a Project sheet come with it. You can sort, filter and quote from it, or paste it into a report or a claim. Next to it you get a PDF on landscape pages with the task table on the left and the Gantt chart on the right: summary tasks as black bars, milestones as diamonds, progress as the darker part of a bar, and the date scale repeated on every page so a long programme stays readable when printed for a site meeting. The same plan in Excel works for Microsoft Project files too.
What stays in Powerproject
We read the programme as Powerproject last calculated and saved it; we do not reschedule anything. Powerproject's own views, bar colours, annotations, code libraries, baselines, cost and earned value data stay in Powerproject. Plans kept on an Asta Enterprise server cannot be uploaded as they are: open the project and save a copy as a .pp file first. If a client asks for the programme in another format, Powerproject can also export to Primavera P6 (.xer) or, with Microsoft Project installed on the same computer, to .mpp, which you can open here as well. XML exports cannot be uploaded here.
Is it safe to upload a programme?
The file is used only to make your Excel and PDF files. It is processed on our own server, nobody looks at it, it is never shared or used for anything else, and it is deleted automatically 24 hours after upload, together with the results. You do not need an account, so there is nothing that links the file to you except the e-mail address you give at payment.
More Project tools
Also on FileOpens
Questions about Asta Powerproject files
Can I open a .pp file without Asta Powerproject?
Yes. Upload it above: you see the tasks and the Gantt chart in the browser, and you can keep the programme as Excel and PDF. No Powerproject licence, no Windows and no installation needed.
Which .pp files can you open?
Project files saved by Asta Powerproject and Asta Easyproject. The free preview shows whether yours opened correctly; if it did not, you pay nothing. Plans on an Asta Enterprise server need to be saved as a .pp file first.
Is a .pp file the same as a PowerPoint or Puppet file?
No. Other programs use .pp too, for example Puppet manifests. If your .pp file came with a construction programme or a bar chart, it is an Asta Powerproject file.
How much does it cost?
You see the first pages of the Gantt chart free. Then $4.99 per programme, or $14.99 for up to 10 files and $39 for up to 100, mixed with any other format we convert. Not usable? Refund within 24 hours.
What happens to my file?
It is used only to make your Excel and PDF files and is deleted automatically 24 hours after upload. Nobody looks at it, and it is never shared.